top of page
Changi Airport Terminal 5
2018 Heatherwick Studio
Images for this project are confidential
2018 Changi Airport T5: Welcome
The Project:
Location: Singapore
Size: 800,000 sq ft
Type: Airport
Team: size 35
Role in the Project
Dates 2018 – 2019
Stages Concept
Project BIM Coordinator
Creation of the BIM Execution Plan for the workflow and coordination with partner architect KPF.
Initial set up of the models. Set processes to improve the efficiency of the team and achieve consistency between the different sub-teams
Assist with the production of documentation. Assist with the production of models for visualisation. Manage the exchange of models with local architects
Collaborate with the Computational Design team to elaborate work processes for the develop of the massing, translating the Rhyno + Grasshopper scripts into Revit Mass and elements.
​
Software used
Documentation: Revit, AutoCAD
Computational Design: Rhyno, Grasshopper, Dynamo
Visualisation: Unreal
2018 Changi Airport T5: Text

2018 Changi Airport T5: Selected Work
bottom of page